BP finance runtime PRD surface

Production Migration Blueprint

A phased path from validation proof to governed enterprise pilot and production scale.

Signal
Context
Policy
Agent
Evidence
Human Gate
Control
Value
Replay
Learning
Migration path
PhaseObjectiveBuild scopeEnvironment
0-30 daysCredibility foundationTopology, inventory, evidence/replay, runtime ops, policy simulationsDemo/sandbox
31-60 daysOperational pilotP2P and O2C case flows, value attribution, process twin, tower atlasControlled dev/test
61-90 daysEnterprise hardeningIdentity, data readiness, adapter onboarding, controls, support modelPilot readiness
Post-90 daysScaled deploymentProduction change gates, support runbooks, phased tower rolloutProduction candidate
Production gates
GateRequirementDecision
IdentityEnterprise SSO, workload identity, role and attribute policyRequired before pilot
DataApproved data products, lineage, freshness, master-data readinessRequired for AL2+
IntegrationAdapter contract, read/write boundary, failure handlingRequired for write-back
GovernanceAgent registration, owner, risk class, policy binding, kill switchRequired for every agent
EvidenceEvidence completeness, replay, audit export, retentionRequired for material decisions
OperationsSLOs, incident handling, fallback, support ownershipRequired for production
Pilot recommendation

Start with bounded P2P duplicate/missing-GR and O2C unapplied-cash flows. Keep production write-back disabled until identity, adapter, policy, evidence, and support gates are signed off.

Simulated versus production

Validation surfaces prove architecture, governance, evidence, replay, and value logic. Production requires approved enterprise connectivity, identity, data products, policy ownership, control certification, and runbooks.