●LIVE — DISRUPTION IN PROGRESS
Tenant: bp • Role: administrator
Operations Disruption Coordination
Enterprise topology • cross-domain propagation • policy-bound coordination — replayable
WOW moment
One operational disruption triggered coordinated decisions across 5 enterprise domains.
Operations → Commercial → FP&A → CFO → Treasury • policy-bound • evidence-sealed • replay-deterministic
Executive impact — current state
Production availability
92.4%
Target ≥ 96% • WCD-3 offline
Margin at risk
$4.2M
30d horizon • 4 contracts
Protected value
$3.1M
via auto-reroute • evidence sealed
Nodes affected
8
2 critical • 6 warning
Propagation SLA
3m 41s
vs 5m target • ✓
Cross-domain propagation chain (refinery_outage)
agent.asset_telemetry
Unplanned downtime detected on REF-WCD-3
agent.production_loss
Production loss quantified: 240k bbl/day
agent.commercial_impact
Commercial impact: 4 contracts at risk
agent.fpa_margin_watch
Margin exposure: $4.2M over 30d horizon
agent.cfo_intelligence
CFO alerted with quantified margin exposure
Refineries (6)
WCD-3 Whiting
WCD-1 Whiting
CHE Cherry Pt.
RTM Rotterdam
CST Castellón
KWN Kwinana
Terminals (5)
Hammond IL
Toledo OH
Cherry Point
Felixstowe
Singapore
Distribution flows (4)
MidWest Pipe
Gulf Coast
Rotterdam Net
Iberian Net
Downstream nodes (4)
am/pm West
ARCO CA
BP UK Retail
Air BP JFK
Operations Supervisor — affected routes
| Route | Action | Status | Severity |
|---|---|---|---|
| MidWest pipeline → Whiting | Diverted to Gulf Coast | rerouted | high |
| Hammond IL inbound | Drawing from CHE Cherry Pt | rerouted | high |
| Toledo OH inbound | Pending operator decision | blocked | critical |
| Felixstowe → Rotterdam | On plan | nominal | ok |
Active disruption scenarios
Refinery Unplanned Outagehigh
5-agent chain: asset → production → commercial → FP&A → CFO
Shipment Disruptionhigh
Inventory pressure → downstream constraints → rerouting decisions
Supply Chain Failure (Critical Spare)critical
Supplier risk + maintenance spike + tight shutdown window